Pre-industrial
Iron Symposium                           October
10, 2004                  Experiment Notes - Viking Age Smelter
Bellows :
    Michael Mahoney
                  Millard
Wyman
                  Paul
Bourdon
Recorder :  Elizabeth Hendrix
Leader :      Darrell Markewitz
TIME                                         EVENT                                                                           MEASUREMENT                                                               
Realative 
Absolute 
Elapsed                                                                                          Relative                   Absolute                  Total       
2:00
pm                                   slow
preheat with split soft wood fire
3:45           1:45                       prep
of bellows (attached to tuyere)
3:50           1:50                       start
of bellows, split soft wood - various users           +/
- 60 /min            
120 l/min
4:17           2:17                       end
of pre-heat phase
4:17                                         fill
furnace with prepared charcoal                                air :  60/min          
130 l/min
                                                                                                   fuel:  60 cm            36900
cc                  37
l 
4:32           0:15        15
min     add charcoal                                                                 air :  60/ min         
130 l/min
                                                                                                                                    fuel :  10 cm            6150 cc                  43
l
4:37                          17
min     bellows
operator changed                                                                                                                     
4:42           0:25                       optical
pyrometer reading                                                                             
2720 F
4:44           0:27        12
min     add charcoal                                                                 fuel :  10 cm          
6150 cc                  49
l
4:48           0:31                       air
rate measured                                                         air :  72 /min         160
l/min    
4:53                          16
min     bellows
operator changed                                              
4:57           0:40        13
min     add charcoal                                                                 fuel :  10 cm          
6150 cc                  55
 l
4:59                          6
min       bellows
operator changed                                              air :  54 /min         120
l/min
5:07                          8
min       bellows
operator changed
5:11                          4
min       bellows
operator changed
5:16                          5
min       bellows
operator changed                                              air :  60 /min         
130 l/min   
                  0:59        19
min     add charcoal                                                                 fuel :  10 cm          
6150 cc                  61
 l
5:29                          13
min     bellows
operator changed                                              air :  72 /min         
160 l/min   
5:32           1:15                       ore
charge (one)                                                           ore :                        
1.5 kg                  1.5
kg
                                 16
min     charcoal
charge on top                                                  fuel :  5 cm            
3075 cc                  64
l
5:41                          13
min     bellows
operator changed                                              
5:42           1:25                       optical
pyrometer reading                                                                             
2660 F
5:44                                         crack
in smelter wall patched
5:47           1:30        15
min     ore charge
(two)                                                           ore :                        
1.5 kg                  3.0
kg
                                                charcoal charge on top                                                  fuel
:  5 cm            
3075 cc                  67
 l
5:53                                         tuyere
blocked / cleared with rod
6:01           1:43        14
min     ore charge (three)
on rear half only                              ore :                        
1.5 kg                  4.5
kg
                                                charcoal charge on top                                                  fuel
:  5 cm            
3075 cc                  70
 l
                                 20
min     change of
bellows operator
6:05                                         tuyere
blocked / cleared with rod
6:06                                         increase
of bellows delivery pressure                           air :  72 /min         
160 l/min
6:11                          6
min       change
of bellows operator
                                                tuyere blocked / cleared with rod
6:15           1:57        13
min     ore charge (four)
on rear half only                                ore :                        
1.5 kg                  6.0
kg
                                                charcoal charge on top                                                  fuel
:  5 cm            
3075 cc                  73
l
                                                                                                                                    air :  60 /min         
130 l/min
6:18                                         larger
crack in furnace repaired
6:23                          5
min       bellows
resumed
6:26                          15
min     change of
bellows operator
6:27                                         optical
pyrometer reading                                                                             
2200 F
6:29                                         tuyere
blocked / cleared with rod
6:32           2:14        17
min     ore charge (five)
on rear half only                                ore :                        
1.5 kg                  7.5
kg
                                                charcoal charge on top                                                  fuel
:  7.5 cm         
4610 cc                  77.6
 l
6:44                          18
min     change of
bellows operator
6:46           2:28        14
min     charcoal
charge added                                                   fuel :  7.5 cm         
4610 cc                  82.2
 l
6:50                          6
min       change
of bellows operator                                            air :  72 /min         
160 l/min
6:55                          5
min       change
of bellows operator
6:58           2:40        14
min     charcoal
charge added                                                   fuel :  10 cm          
6150 cc                  88.2
 l
7:04                                         optical
pyrometer reading                                                                             
2680 F
7:12           2:54        14
min     charcoal
charge added                                                   fuel :  7.5 cm         
4610 cc                  92.8
 l
7:20
                         25
min     change of
bellows operator
7:24                          4
min       change
of bellows operator
                  3:06        12
min     charcoal
charge added                                                   fuel :  5 cm            
3075 cc                  95.8
 l
7:29                                         repair
of crack in smelter
7:30           3:12        6 min       ore charge
(reduction fines) added                                 ore :                        
.5 kg (350 ml)             8 kg
                                                                                                                                    fuel :  5 cm            
3075 cc                  98.8
 l
7:40                                         slowing
of bellows rate during repair
7:50                          26
min     change of
bellows operator, 
rate continues slow           
7:53           3:35        17 min     final charcoal charge
added                                           fuel :  5 cm            
3075 cc                  102  l
8:15                          25
min     change of
bellows operator, rate continues slow
8:25                          10
min     change of
bellows operator, 
rate continues slow
8:40           4:05                       end
of firing
8:40                                         start
scooping remaining charcoal from smelter
8:45           4:10        5 min       bloom /
slag bowl exposed
8:54           4:19        9 min       bloom /
slag mass extracted from smelter
                                                                                                                                    
AIR :          Calculated
against earlier measurement to fixed volume / note variation by operator                  2.2
l per stroke (average)
FUEL :         Calculated
by height at fixed furnace dimension of 28 cm diameter                                              615
cc per cm
ORE :          Total
of 17.5 lbs /  8 kg roasted ore was prepared / charges estimated individually
by volume   1.5 kg per charge
Patching :   Each time a hole / crack was patched, the
bellows was stopped for the time required, typically about 2 - 3 minutes
Clearing :   Each time the tuyere was cleared,
the bellows was stopped for the time required, typically about 1 - 2 minutes
Operator : There were a number of people who assisted in bellows operation, especially during the pre-heat phases. There was considerable variation in rate, loft and pressure between these. Typically these are represented by the short bellows operator times. From the begining of the ore charge phase, the three primary operators rotated, delivering a much more consistant and controled rate / loft / pressure.