TIME EVENT ORE CHARCOAL
ABSOLUTE ELAPSED ADD (scoops) TOTAL LBS TOTAL LBS
(at 1 lb) (each 4 lbs)
12:40 1:25 preheast with wood splints
14:05 fill with rough carcoal x 3 12
add rough charcoal 16
14:15 start graded fuel 20
14:23 8 24
14:27 4 28
14:34 additiion seed charge 0.5 0.5
14:40 13 32
14:42 additiion seed charge 0.5 1
14:52 12 additiion seed charge 0.5 1.5 36
15:02 10 additiion seed charge 0.5 2 40
15:10 increase ore 1 3
first slag shows at tap hole
15:20 18 additiion seed charge 0.5 3.5 44
15:30 10 ore now even through charge 1 4.5 48
15:40 10 1 5.5 52
15:50 10 increase ore 1.5 7 56
16:00 10 1.5 8.5 60
16:10 10 1.5 10 64
16:20 10 first lb as slug, second lb evenly 2 12 68
16:30 10 2 14 72
16:35 clear clay and slag from tap hole
16:40 10 increase ore 3 17 76
additional ore (?) 1 18
16:50 10 3.5 21.5 80
17:00 10 4 25.5 84
17:10 10 3 28.5 88
17:20 10 2 30.5 92
17:30 10 2 32.5 96
17:40 10 3 35.5 100
17:50 10 3 38.5 104
17:55 5 3 41.5 108
18:12 17 average above to 11 each? 3 44.5 112
18:20 8 3 47.5 116
18:30 10 2 49.5 120
slag tappd, about 600 ml E
18:37 7 2 51.5 124
18:47 10 plus 2 lb tapped slag added 3 54.5 128
2 56.5 132
19:05 17 average above to 9 each? 2 58.5 136
19:13 8 1 59.5 140
19:25 12 3 62.5 144
19:30 5 as magnatite sand 2 64.5 148
19:38 8 as magnatite sand 2 66.5 152
19:45 7 as magnatite sand 3 69.5 156
19:55 10 return to limonite ore 2 71.5 160
20:03 8 3 74.5 164
20:12 9 2 76.5 168
20:18 6 2 78.5 172
START BURN DOWN
20:30 176
20:37 additional ore 0.5 79 180
20:47 184
HR / MIN 8:07 + TOTALS LBS 79 184
KG 35.91 83.64
BLOOM PRODUCED LBS 14.5
KG 6.59
% 18