EVENT |
Date |
03-Oct-16 |
|
|
|
|
|
|
|
|
Description |
SCC training build |
|
|
|
|
|
|
|
|
Goal |
static display furnace |
|
|
|
|
|
|
|
|
Team |
Darrell Markewitz (M) |
|
|
|
|
|
|
|
|
|
Richard Hiden |
|
|
|
|
|
|
|
|
|
Dirk Spodeltuer |
|
|
|
|
|
|
|
|
|
Imelda Nealf |
|
|
|
|
|
|
|
|
photos |
Kelly Probyn-Smith |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FURNACE |
Type |
standard short shaft |
|
|
|
|
|
|
|
|
Material |
local clay |
|
|
|
|
|
|
|
|
Interior |
at tuyere |
35 |
|
|
|
|
|
|
|
Height |
|
56 |
|
|
|
|
|
|
|
Stack |
|
41 |
|
|
|
|
|
|
|
Base |
|
15 |
|
|
|
|
|
|
|
Packing |
charcoal fines |
14 |
|
|
|
|
|
|
|
Tuyere |
steel pipe |
|
|
|
|
|
|
|
|
Diameter |
|
4.5 |
|
|
|
|
|
|
|
Angle |
|
-20 |
|
|
|
|
|
|
|
Proud |
|
? |
|
|
|
|
|
|
|
Air System |
shop vac |
|
|
|
|
|
|
|
|
Extraction |
potential bottom arch |
22 x 25 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MATERIALS |
Ore |
none used (system test) |
|
|
|
|
|
|
|
|
Charcoal |
various Scottish types |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CLOCK |
ELAPSED |
EVENT |
AIR |
|
CHARCOAL |
|
|
ORE |
|
absolute |
|
|
|
|
UNIT |
COUNT |
TOTAL |
Unit |
TOTAL |
|
|
no air readings made |
pressure |
setting |
bucket |
|
kg |
kg |
kg |
|
|
|
psi |
|
|
charcoal |
2.5 |
|
|
1500 |
|
start wood splints pre-heat |
|
|
|
|
|
|
|
1511 |
|
start adding rough charcoal |
|
|
1.5 |
1.5 |
3.75 |
|
|
1514 |
|
rough to fill |
|
|
1 |
2.5 |
6.25 |
|
|
1516 |
|
start intervals |
|
|
|
|
|
|
|
1523 |
7 |
addition of graded fuel |
|
|
1 |
3.5 |
8.75 |
|
|
1531 |
8 |
|
|
|
1 |
4.5 |
11.25 |
|
|
1538 |
|
seal bottom arch |
|
|
|
|
|
|
|
1542 |
11 |
|
|
|
1 |
5.5 |
13.75 |
|
|
1552 |
10 |
|
|
|
1 |
6.5 |
16.25 |
|
|
|
|
|
|
|
|
|
|
|
|
1610 |
|
end test sequence |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Limited test, build to
fire in one day |
|
|
|
|
|
|
|
|
working day ends at 1600 |
|
|
|
|
|
|
|