CLOCK ELAPSED EVENT CHARCOAL ORE
Slag Pit - Mid Summer UNIT COUNT TOTAL Unit TOTAL
actual 23-Jun-18 LpM bucket kg kg kg
data recored by Margert Gissing 1.8 ?
1035 start wood splints pre-heat - pine
damper closed, pots open
1055 switch to maple splits
1105 ports closed
1123 gentle air blast starts 200
1124 air increased 300
1135 fill with rough charcoal (maple) 800 4 4 7.20
1146 additional rough charcoal 1 5 9.00
1155 touch off volitiles
1154 1 30 switch to graded charcoal (maple) 1 6 10.80
1200 main sequence start 
1205 9 charcoal additions 1 7 12.60
1217 12 1 8 14.40
1229 12 1 9 16.20
1239 10 1 10 18.00
1251 12 increase air 900 1 11 19.80
start iron slag addition (T= ?)
1312 21 (may be point missing?) 1 12 21.60 1S 1S
1319 7 1 13 23.40 1S 2S
1333 14 addition gromps 1 14 25.20 1G 1G
1346 13 1 15 27.00 1G 2G
1357 11 addition of ore analog (DD1A) 1 16 28.80 1 1
1410 13 1 17 30.60 1 2
1422 12 1 18 32.40 1 3
1434 12 1 19 34.20 1 4
1445 11 switch to graded oak 1 20 36.00 1 5
1455 10 1 21 37.80 1 6
1509 14 1 22 39.60 1 7
1521 12 increase ore - as 1/3ds 1 23 41.40 1.5 8.5
1535 14 1 24 43.20 1.5 10
1547 12 1 25 45.00 1.5 11.5
1604 17 increase ore - as 1/4s 1 26 46.80 2 13.5
1608 increase air 1000
1614 10 1 27 48.60 2 15.5
1623 9 1 28 50.40 2 17.5
1636 13 1 29 52.20 2 19.5
1646 10 1 30 54.00 2 21.5
1657 11 1 31 55.80 2 23.5
1706 9 1 32 57.60 2 25.5
1720 14 1 30 54.00 2.7 28.2
1731 11 last charcoal to cover 1 31 55.80
1737 6 additional cover 1 32 57.60
burn down  900
(no record of extraction time)
TOTALS
Charcoal kg 58
Ore (plus 2 kg slag / 2 kg gromps) kg 28.2
Bloom kg 6.1
Yield % 21.6%