'Look at all the BONES...' 
      Addition of Animal bones into a
            Bloomery Iron Smelt
              June 20, 2020
          Wareham, Ontario
        
      Smelt Team: 
          Neil Peterson, Rey Cogswell
          Smelt Master : Darrell Markewitz
        
    
    ABSTRACT
    
        Several recent papers have suggested the
      presence of small fragments of bone sometimes found within the
      debris fields related to bloomery iron smelting point to a
      possible 'ritual' practice, even so far as proposing a functional
      impact on iron bloom quality. How might the physical process
      within a complete iron making sequence effect the ability of bone
      to endure, and thus remain to be recovered archaeologically? A
      typical 'short shaft' furnace will be constructed and operated
      through to bloom extraction on a clean working surface. Both bone
      pieces and meat containing bone of several animal types will be
      added, before, during, at at the final stage of the smelting
      process. Afterwards, the debris field will be examined in detail
      to determine what remains of the bones.
    
    
    The BUILD :
    
    The intent of this experiment was to build a standard ’Short Shaft’
    furnace, on a prepared clean base, then undertake a careful
    examination of the final debris field. 
    
    
      
        
            
           | 
            
           | 
        
        
          Figure 1 : underlay of
              concrete slabs - view to east 
             | 
          Figure 2 : sand pad | 
        
      
    
    
        As this was intended to be a short duration
    experiment examined in detail, a hard flat base was created by
    laying a set of 24 x 24 inch (60 x 60 cm) concrete patio slabs down
    over the natural grass surface of the main smelting area. A square
    frame was created from 6 foot long pieces nominal 2 x 2 inch lumber
    (so about 4 x 4 cm by 1.8 m). This was used to contain a fill of
    course sand, establishing a flat surface with a depth again at 4 cm.
    This combination would allow for easy recording of any created
    debris, and also in clearing of the area afterwards. 
    
        As the function of the furnace itself was not
    under investigation, a long proven design and building methods were
    used. (1)
    The furnace shaft was raised on a plinth of stone blocks, filled
    with charcoal fines. This allows for both better control of slag
    levels, and assists in the extraction process. There were a
    selection of natural granite blocks on hand. (acquired for the
    Icelandic Stone Block series, also ongoing at the same time). These
    were irregular sizes, but all roughly 10 cm tall, and varied in
    width and length. These were laid as one full circle, roughly 30 cm
    internal diameter (ID), with a second layer positioned with a gap to
    the front (extraction) side. 
    
    
      
      Figure 3 (2) : Stone plinth as established 
     
    
        The mix used for the construction of the furnace
    shaft was powdered potters clay (EPK), locally dug course sand and
    dry shredded horse manure, combined in rough thirds by volume. This
    was hand blended with water to what is considered an ideal
    consistency for building. 
    A metal form at 28 cm wide, wrapped in paper to prevent clay
    sticking, was used to establish and control the internal diameter. 
    
    
      
      Figure 4 : At the completion of the lower layer, the metal form
        in place.
     
    
        Figure 4 also shows the establishment of a
    ‘Beardsley Break’, here seen with a coating of charcoal fines. (3)
    As is the normal practice, the body of the furnace was built up of
    hand sized ‘bricks’ of the clay mix, pressed together and around the
    metal form. As a full batch height was finished, the form was pulled
    out and clear, with the interior filled with a mix of sand and wood
    ash to stabilize and assist drying.  As the structure got
    higher, it proved necessary to spiral wrap rope around the exterior
    to prevent slumping (impressions of the rope can be seen in figure
    5).
    
    
      
        
          
              
             | 
              
             | 
          
          
            Figure 5 : Finished
                furnace, extraction and tapping arches cut,  
               tuyere installed. | 
            Figure 6 : Overall
                measurements | 
          
        
      
      
     
        The extraction arch was cut to almost the height
    of the tuyere, total 20 x 20 cm, with a smaller tapping arch on the
    lower edge. The forged copper tuyere was set to 22.5 degrees down
    angle, 5 cm proud of inner wall, and the base depth adjusted via
    charcoal fines to 20 cm. With the total height of the clay walls at
    66 cm above the stone plinth, the net result was stack height (above
    tuyere) of 48 cm. 
    A number of concrete blocks were used to support the tuyere and air
    system. The placement of these would remain clear within the debris
    field during later examination after the completed smelt
    
    
    
      Figure 7 : Overall working area, at the start of the smelt,
        view to south east
    
    
    The SMELT : 
    
    The combination of gentle drying fire the day before, plus the
    pre-heat sequence also using fine twigs, served to place a layer of
    wood ash over the charcoal fines base. Some of the fines had also
    been consumed, so the functional base distance was closer to 29 cm
    (below centre of tuyere). 
    
    
      
      Figure 8 : Ash over charcoal fines, at the
          start of the experiment. 
      
     
    
        The sequence undertaken
    for the smelt itself was again fairly standard :
    
      -  A quantity of commercial maple charcoal was graded (25 to 5
        mm pieces)
 
      -  Standard Bucket of charcoal weight at 1.8 kg, a total
        of  52 kg was used.
 
      -  Air supplied by electric blower, varying from an estimated
        650 to 835 litres per minute (4)
 
      -  Ore was DD1 analog (red iron oxide) at 53 % Fe, total of 25
        kg was used
 
      -  Initially charges of iron rich tap slag were added, total of
        4 kg.
 
      -  At the end a single charge of metallic gromps were added,
        total of 1 kg
 
    
        There was considerable variation in the burn
    rates, with outliers at 11 and 23 minutes / bucket.
    
      -  Average burn rate was 7.9 minutes per kg
 
      -  Average ore addition was 6.7 minutes per kg
 
      -  The bloom was (disappointingly) small at 2.6 kg
 
      -  The yield was 10. 5 %, with the mass of the gromps included
 
    
    
      
      Figure 8 : Working area, the following morning
     
    
    ADDITIONAL : Photo series over the
    progression of the smelt.
    
    Adding BONES :
    
        A quantity of animal bones of various types had
    been gathered for addition at various points during the progress of
    this iron smelt. Some were retained after household meals, the
    pieces with meat on were donated by the local grocery store meat
    department (Foodlands, Dundalk ON).  
    
    
    
    Figure 9 : Bone pieces as collected.
    
    
      -  (far left) = Poultry (Turkey) - breast bone, raw with meat
        remaining
 
      -  (left) = Poultry (Turkey) - thigh bone, cooked (roasted) with
        majority of meat removed
 
      -  (right, upper) = Pork - cut rib sections, cooked (slow
        cooker) all meat and marrow removed
 
      -  (right, lower) = Pork - cut rib sections, raw with meat
        remaining
 
      -  (far right, upper) = Beef - cut (lower?) leg section, cooked
        (boiled) all meat and marrow removed
 
      -  (far right, lower) = Beef - cut rib (steak) section, cooked
        with majority of meat removed
 
    
        Although the pieces were photographed against a
    scale ‘as fresh’, no other specific measurements were made of sizes
    or weights. Because of this, the results should be considered
      ‘qualitative’. The initial concept was to make two additions,
    one at the start of the smelt process and one half way through ore
    additions, hence the grouping seen in figure 9.
    
        At the end of the preheat phase, the extraction
    arch was opened and a set of bones was placed over the hot ash and
    still burning charcoal fragments :
    
    
    
    Figure 10 : Bones at base level, showing
        individual placement. Tuyere is to the left side this image.
    
    
      -  Rear (L - R) : Turkey thigh / Pork ribs (meat) / Turkey
        breast (meat)
 
      -  Front (L - R) : Beef leg section / Turkey thigh / beef rib
        (bracketing) / Pork rib sections 
 
    
        The first pieces of charcoal were carefully added
    through the extraction arch, to ensure the few remaining hot pieces
    of charcoal would serve to ignite the upper layers. Once it was
    clear this had happened, the arch was replaced, and the furnace
    filled with rough charcoal. From this point the smelt sequence was
    carried out as normal. 
    
        At roughly two hours into the sequence, a second
    group of bones was placed on the top of the filled furnace. At this
    point (13:40) there had been a total of 5 kg of combined iron slag
    and ore added to the furnace (so still early in the iron reduction
    process). 
    
    
    
    Figure 11 : Bones placed part way through the
        smelt sequence
    
      -  Centre top : Pork rib sections
 
      -  Centre : Pork ribs (meat)
 
      -  Centre bottom : Turkey breast (meat)
 
      -  Left : Turkey thigh
 
    
        With the decision to make three separate bone
    additions, some of the larger pieces (Pork ribs and Turkey breast,
    both with meat) were cut in two. The bone pieces added at this time
    were placed to one side of the furnace, away from the tuyere. This
    was done to echo the normal placement of ore, as the hottest part of
    the furnace is directly above the tuyere, typically resulting in
    faster consumption to that side (and hence faster dropping down the
    stack in this area). The temperature at the top surface of a working
    furnace has been measured previously to the range of 400 - 500 C, so
    even in the short time it took to grab the camera and record this
    image, heat effects are visible (meat cooking, exposed fats starting
    to carbonize) (5) 
        These pieces have been intentionally placed away
    from the side of the furnace above the tuyere. The area close
    around, especially just above, the tuyere is the hottest part of the
    furnace, so charcoal above this is consumed faster. Normal practice
    is to place ore in the same location seen with the bone placement,
    to ensure the best possible progressing through the lower reduction
    zone.
    
        At the end of the ore additions (estimated at
    about three hours since the initial charcoal filling), a last set of
    bone pieces was placed :
    
    
    
    Figure 12 : Bones placed at the end of ore
        additions.
    
    
      -  Left top : Turkey breast (meat)
 
      -  Left bottom : Turkey thigh
 
      -  Centre : Turkey thigh
 
      -  Centre bottom : Beef leg section
 
      -  Right top : Pork rib sections
 
      -  Right centre : Pork rib sections (meat)
 
      -  Right bottom : Beef rib section
 
    
        One extra last full bucket of charcoal was added
    to cover these bones, then the charcoal in the stack allowed to burn
    down in preparation for extraction.
    
        Another aspect visible in figure 13 are the short
    bright orange streaks. These are likely small particles of ore that
    have been reduced to fragments of metallic iron, but under the
    effect of the air blast are being re-oxidized (burned). This may
    even be a sign that the combination of too high a slag bowl and
    internally draining liquid slag is resulting in the bloom being
    eroded by the blast almost as fast as new metal is being deposited.
    (One possible cause of the smaller than expected final bloom size,
    which was found to be a fairly
      flat ‘cake’, rather than the more typical half bowl shape as
    it was extracted.)
    
      
      Part Two : EXPLORATION
    
    
    Notes :
    
    1) See : ‘If you
      don’t get any IRON…’ 
    
    2) Images taken during the build suffered in quality because of the
    contrast between the bright sunlight and the shadow created by the
    temporary overhead cover used at that point. 
    
    3) This feature named after George Beardsley, who had
    demonstrated it’s use during a cast iron session at the Scottish
      Sculpture Workshop in 2014. The purpose is to prevent any
    cracking of the clay shaft from extending
      upwards, caused when the clay shrinks while formed over an
    irregular stone base.
    
    4) Air was controlled by the sliding plate blast gate,
    set to marks for 800 / 900 / 100 LpM. More precise measurements
    undertaken during experiment
      # 90 (October 2021) have been applied here to correct the
    original numbers.
    
    5) It is worth noting that despite the high temperatures over the
    top of the furnace, the upper charcoal is not showing much effect.
    It is usual to see contained water vapourizing (but hard to
    photograph). Inside the walls of the furnace at this level there is
    no actual free oxygen to support combustion. Air / oxygen injected
    at tuyere level has combined with carbon from the charcoal, with
    further reaction with the iron oxide ore creating a carbon dioxide
    atmosphere at the top of the furnace.
    
    
     unless
              otherwise credited - Text and photography © Darrell
              Markewitz