EVENT |
Date |
June (21)
2024 |
|
|
|
|
|
|
|
|
Description |
Pulsing Air 2 / Baron's 7 demo |
|
|
|
|
|
|
|
|
Goal |
mechanical air gate |
|
|
|
|
|
|
|
|
Team |
Darrell Markewitz (M) |
|
|
|
|
|
|
|
|
|
Neil Peterson |
|
|
|
|
|
|
|
|
|
Ray Cogswell |
|
|
|
|
|
|
|
|
|
Kiernan
Rodgers |
|
|
|
|
|
|
|
|
|
Autumn |
|
|
|
|
|
|
|
|
records |
Ray Cogswell |
|
|
|
|
|
|
|
|
photos |
various |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FURNACE |
Type |
standard short shaft / rock plinth |
|
|
|
|
|
|
|
|
Material |
clay /ground furnace wall |
|
|
|
|
|
|
|
|
Walls |
cylinder
+ cut metal pail |
5 - 2.5 |
|
|
|
|
|
|
|
Interior |
|
25 |
|
|
|
|
|
|
|
Height |
|
48 |
|
|
|
|
|
|
|
Stack |
pail extends 47 cm |
82 |
|
|
|
|
|
|
|
Base |
|
13 |
|
|
|
|
|
|
|
Packing |
charcoal fines topped with ash |
10 |
|
|
|
|
|
|
|
Tuyere |
standard ceramic |
|
|
|
|
|
|
|
|
Diameter |
|
2 |
|
|
|
|
|
|
|
Angle |
|
-22.5 |
|
|
|
|
|
|
|
Proud |
|
4.5 |
|
|
|
|
|
|
|
Air System |
electric blower via sliding gate / smelt
bellows |
|
|
|
|
|
|
|
|
Extraction |
bottom via arch |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MATERIALS |
Ore |
DD 1 (red) |
51% Fe |
|
|
|
|
|
|
|
Charcoal |
mixed ash - Goltz |
1.7 ? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CLOCK |
ELAPSED |
EVENT |
AIR |
|
CHARCOAL |
|
|
ORE |
|
|
|
|
|
|
UNIT |
COUNT |
TOTAL |
Unit |
TOTAL |
|
|
|
pressure |
LpM |
bucket |
|
kg |
kg |
kg |
|
|
|
psi |
|
|
|
1.9 |
|
|
|
|
|
|
|
|
|
|
|
|
800 |
|
start wood splints pre-heat |
|
|
|
|
|
|
|
840 |
|
gentle air |
|
touch |
|
|
|
|
|
952 |
1 52 |
first rough charcoal addition / air via gate |
|
500 |
|
|
|
|
|
958 |
|
air increased |
|
900 |
|
|
|
|
|
1005 |
13 |
first bucket |
|
|
1 |
1 |
1.9 |
|
|
1006 |
|
fill furnace |
|
|
1 |
2 |
3.8 |
|
|
1017 |
|
extend furnace with cut metal pail |
|
|
1 |
3 |
5.7 |
|
|
1021 |
|
fill extension |
|
|
1 |
4 |
7.6 |
|
|
1029 |
8 |
|
|
|
1 |
5 |
9.5 |
|
|
1039 |
10 |
|
|
|
1 |
6 |
11.4 |
|
|
1052 |
13 |
|
|
|
1 |
7 |
13.3 |
|
|
1100 |
|
wind gauge @ 18 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1101 |
9 |
start graded charcoal - Main Sequence Start |
|
|
1 |
8 |
15.2 |
|
|
1103 |
|
Bellows test / gauge : Darrell = 35 |
|
|
|
|
|
|
|
|
|
Neil = 32 - 28 |
|
|
|
|
|
|
|
1110 |
|
Ray = 29 - 19 |
|
|
|
|
|
|
|
1113 |
|
?? = 35 |
|
|
|
|
|
|
|
1115 |
|
?? = 28 - 21 |
|
|
|
|
|
|
|
1116 |
|
blower via gate = 35 |
|
1050 |
|
|
|
|
|
1119 |
18 |
|
|
|
1 |
9 |
17.1 |
|
|
1135 |
16 |
|
|
|
1 |
10 |
19.0 |
|
|
1156 |
21 |
|
|
|
1 |
11 |
20.9 |
|
|
1213 |
|
Temperatures (over time ? to 1235) |
|
|
|
|
|
|
|
|
|
970 / 1240 / 1245 / 1160 / 1020 |
|
|
|
|
|
|
|
1223 |
27 |
|
|
|
1 |
12 |
22.8 |
|
|
1236 |
13 |
|
|
|
1 |
13 |
24.7 |
|
|
1251 |
|
gate "from 15 to 10/10 sec" ?? |
|
|
|
|
|
|
|
1253 |
|
gauge = 36 |
|
|
|
|
|
|
|
1257 |
21 |
|
|
|
1 |
14 |
26.6 |
|
|
1336 |
39 |
tap slag added |
|
|
1 |
15 |
28.5 |
1 S |
1 S |
1356 |
20 |
|
|
|
1 |
16 |
30.4 |
1 S |
2 S |
1422 |
12 |
|
|
|
1 |
17 |
32.3 |
1 S |
3 S |
1438 |
16 |
|
|
|
1 |
18 |
34.2 |
1 S |
4 S |
1456 |
|
self tapping |
|
|
|
|
|
|
|
1500 |
22 |
(error - see below ?) |
|
|
1 |
19 |
36.1 |
1 |
1 |
1508 |
8 |
(error - see above ?) |
|
|
1 |
20 |
38.0 |
1 |
2 |
1512 |
|
power fails, air cut off / bellows air |
|
|
|
|
|
|
|
1519 |
|
power resumes / air to full |
|
1200 + |
|
|
|
|
|
1536 |
28 |
|
|
|
1 |
21 |
39.9 |
1 |
3 |
1605 |
|
temperatures (bottom to top) |
|
|
|
|
|
|
|
|
|
blocked / 1220 / 1015 / 980 / 760 |
|
|
|
|
|
|
|
1609 |
33 |
|
|
|
1 |
22 |
41.8 |
1 |
4 |
1639 |
30 |
|
|
|
1 |
23 |
43.7 |
1.5 |
5.5 |
1703 |
24 |
|
|
|
1 |
24 |
45.6 |
1.5 |
7 |
1727 |
24 |
|
|
|
1 |
25 |
47.5 |
1.5 |
8.5 |
1758 |
31 |
|
|
|
1 |
26 |
49.4 |
2 |
10.5 |
1817 |
|
"changed
air system, remove most fittings" ? |
|
|
|
|
|
|
1826 |
28 |
|
|
|
1 |
27 |
51.3 |
2 |
12.5 |
1844 |
18 |
massive slag tap |
|
|
1 |
28 |
53.2 |
2 |
14.5 |
1856 |
12 |
|
|
|
1 |
29 |
55.1 |
3 |
17.5 |
1900 |
|
air reduced |
|
1000 |
|
|
|
|
|
1913 |
17 |
|
|
|
1 |
30 |
57.0 |
3 |
20.5 |
1931 |
18 |
|
|
|
1 |
31 |
58.9 |
3 |
23.5 |
1957 |
26 |
|
|
|
1 |
32 |
60.8 |
3 |
26.5 |
2004 |
|
power fails, air cut off |
|
|
|
|
|
|
|
|
|
start (rushed) extraction / no burn down |
|
|
|
|
|
|
|
2028 |
|
finish extraction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTALS |
|
|
|
|
|
|
|
|
|
|
Charcoal |
|
61 |
kg |
|
|
|
|
|
|
Ore |
|
26.5 |
kg |
|
|
|
|
|
|
|
iron slag added |
4 |
kg |
|
|
|
|
|
|
Bloom |
|
2 - 2.5 E |
kg |
|
|
|
|
|
|
Gromps |
|
|
|
|
|
|
|
|
|
Yield |
potential 9 - 12 kg ore remains in
stack ?
|
|
8 to 12 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Condition |
very fragmented |
|
|
|
|
|
|
|
|
Quality |
?? |
|
|
|
|
|
|
|