EXPERIMENT |
TEAM |
DATE |
TYPE |
CONSTRUCTION |
HEIGHT |
|
DIAMETER |
TUYERE |
|
|
|
AIR |
|
ORE TYPE |
|
|
CHARCOAL |
|
TIME |
EXTRACTION |
BLOOM |
|
|
OBJECTIVES |
RESULTS |
|
|
|
|
|
TOTAL |
STACK |
INTERIOR |
TYPE |
ANGLE |
from WALL |
ABOVE DASE |
TYPE |
VOLUME |
|
Fe |
WEIGHT |
WEIGHT |
average RATE |
main sequence |
|
|
CONDITION |
YIELD |
|
|
|
|
|
|
|
cm |
cm |
cm |
|
degrees |
cm |
cm |
|
litre/min |
|
% |
kg |
kg |
min / charge |
hr / min |
|
kg |
|
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Parks Canada |
27-Jun-01 |
boxed bowl |
stone slabs , clay seal |
50 |
42 |
35 x 30 |
steel pipe |
upwards |
3 |
5 |
Norse double bag |
130 E |
bog ore |
62.7 |
1.5 |
8 |
slug |
2:00 |
disassembled |
0.1 |
cast iron prills |
n/a |
primary experiment on forms suggested by LAM |
restricted by materials and equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 / D1 |
DARC |
26-May-02 |
boxed bowl |
stone slabs , clay seal |
40 |
|
45 x 40 |
steel pipe |
slightly up |
|
? |
Norse double bag |
100 E |
bog ore, forge scale |
65.7 |
6 |
22 |
slug |
8:00 |
after cold |
none |
partially sintered |
n/a |
repeat #1 with shop support |
development of post smelt measurements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 / D2 |
DARC |
6-Jun-03 |
medium shaft |
cob, refactory lined |
90 |
55 |
27 to 24 |
steel pipe |
flat |
5 |
20 ? |
vacumn blower |
NR |
rock ore |
55 - 60 |
8.1 |
50 |
|
4:30 |
dissassembled |
none |
sintered mass |
n/a |
application of learned techniques |
burn out at about 3/4 of reaction haults |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 / D3 |
DARC |
Jun-04 |
boxed short shaft |
cobb inside stone slabs |
55 |
50 |
25 |
steel pipe |
15 down |
5 |
2 |
Norse / hand crank |
125 |
rock ore |
55 - 60 |
7 |
19 |
|
6 |
disassembled |
none |
vapourized |
n/a |
establish standard smelter |
too wet walls slump for poor tuyere placement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Early Iron 1 |
11-Oct-04 |
short shaft |
cobb partially banked |
60 |
46 |
33 to 30 |
steel pipe |
15 down |
3 |
14 |
Norse double bag |
125 |
rock ore |
55 - 60 |
8 |
20 |
15 |
5:45 |
top |
none |
pre bloom mass' |
n/a |
application of historic methods |
iron starting to condense in sliced sections |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 / D4 |
DARC |
23-Oct-04 |
Econo Norse |
brick inisde stone |
68 |
45 |
35 |
steel pipe |
20 down |
5 |
23 |
vacumn blower |
550 |
rock ore |
55 - 60 |
8 |
22 |
10 |
4 |
top |
2 |
cast iron |
25.0% |
develop easy to build test furnace |
prototype teaching furnace. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Smeltfest 1 |
25-May-05 |
Econo Norse |
brick inside sheet |
60 |
40 |
25 |
forged copper |
20 down |
5 |
18 |
vacumn blower |
815 |
rock ore |
55 - 60 |
35 |
85 |
8 |
7 |
dissassembled |
6.5 |
soft iron |
18.6% |
refine test / teaching furnace |
use of forged copper tuyere |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
Smeltfest 1 |
27-Feb-05 |
Econo Norse |
brick inside sheet |
60 |
40 |
25 |
forged copper |
20 down |
5 |
18 |
vacumn blower |
815 |
rock ore |
55 - 60 |
28 |
85 |
|
7 |
dissassembled |
7.5 |
not tested |
26.8% |
refine test / teaching furnace |
dupilcate of above |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
OABA |
14-May-05 |
Econo Norse |
brick inside sheet |
60 |
40 |
25 |
steel pipe |
20 down |
5 |
20 |
various |
inconsistant |
taconite |
65.0 |
21.3 |
67 |
11 |
7:30 |
dissassembled |
9.5 |
workable iron |
44.6% |
introduce method to Ontario Blacksmiths |
ash / sawdust packing produces much slag |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
failure of air equipment / multiple systems |
10 / D5 |
DARC demo |
11-Jun-05 |
boxed short shaft |
cobb inside stone slabs |
60 |
46 |
25 |
steel pipe |
20 down |
5 |
16 |
Ubber Bellows * |
600 E |
taconite |
65.0 |
10.9 |
38 |
12 |
5:30 |
top |
3 |
workable iron |
27.5% |
develop VA demonstration methods |
switch to blower at 2:30 @ 815 LpM |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 / D6 |
DARC demo |
1-Sep-05 |
boxed short shaft |
cobb inside stone slabs |
60 |
46 |
25 |
steel pipe |
20 down |
5 |
15 |
Ubber Bellows * |
600 E |
taconite |
65.0 |
10.9 |
47 |
9 |
9 |
top |
2 |
cast iron |
18.3% |
CANIRON 4 - historic demonstration |
switch to blower at 6:40 (no volume) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
Early Iron 2 |
Oct-05 |
Flue Tyle |
reinforced tile |
60 |
40 |
25 x 25 |
forged copper |
20 down |
5 |
|
electric blower |
< 1000 |
rock ore |
55 - 60 |
15.9 |
50 + * |
|
7:30 |
bottom |
3.4 * |
workable iron * |
NA |
teaching |
second 'Rescue' bloom only |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13/ D7 |
DARC |
12-Nov-05 |
boxed short shaft |
cobb inside stone slabs |
60 |
42 |
25 |
ceramic tube |
22.5 down |
5 |
16 |
vacumn blower |
600 E |
taconite / rock ore |
60 E |
19.7 |
80 |
7 |
6:15 |
top |
4.3 |
workable iron |
21.8% |
establish repeatable methods |
general control and understanding |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14 |
Black Rock |
18-Feb-06 |
Econo Norse |
brick inside sheet |
60 |
40 |
25 |
ceramic tube |
22.5 down |
5 |
|
vacumn blower |
800 E |
taconite |
|
45.5 |
107 |
10 |
7:30 |
dissassemble |
13.5 |
workable iron |
29.7% |
teaching |
environment temperature of limited effect |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15 |
Dick Sargent |
8-Mar-06 |
medium shaft |
cobb on plinth |
85 |
60 |
30 to 40 |
ceramic tube |
22 down |
6 |
19 |
vacumn blower |
970 |
hematite |
69 |
45.5 |
86 |
7 |
7:30 |
bottom |
21.8 |
lacey mid carbon |
47.9% |
use of hematite, modifications to furnace |
flask shaped with use of hematite |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
16 |
Dick Sargent |
10-Mar-06 |
short shaft |
cobb on plinth |
60 |
40 |
28 to 40 |
ceramic tube |
22 down |
5 |
14 |
vacumn blower |
970 |
hematite |
69 |
45.5 |
68 |
7 |
4:00 |
bottom |
20 |
lacey mid carbon |
44.0% |
repeat above |
re-use of smelter # 15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
17/ D8 |
DARC |
10-Jun-06 |
half banked short shaft |
clay cobb |
65 |
45 |
23 |
ceramic tube |
22.5 down |
5 |
7 |
vacumn blower |
1060 |
rock ore |
? |
18 |
87 |
9 |
8:10 |
top |
2.8 |
cast iron |
15.6% |
use of half banked furnace construction |
all coverted to cast iron or high iron slag |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
18 / D9 |
DARC |
2-Sep-06 |
boxed short shaft |
cobb inside stone slabs |
60 |
35 E |
15 x 19 |
ceramic tube |
20 down E |
5 E |
|
Ubber Bellows |
600 E |
rock ore |
|
10.5 |
57 |
20 |
6:10 |
top |
|
cast iron ? |
|
layout based on LAM - use of Ubber Bellows |
problems with bellows design and labour |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
19 |
Early Iron 3 |
5-Oct-06 |
short shaft |
clay cobb |
66 |
50 |
20 |
ceramic tube |
22.5 down |
5 |
13 |
vacumn blower |
700 |
red ochre |
|
8.8 |
36 |
15 |
4:00 |
dissassemble |
0.7 |
nodules cast iron |
8.0% |
test of ore body |
assumed low iron content demonstrated |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
20 |
Dick Sargent |
9-Oct-06 |
Flue Tyle |
reinforced tile |
60 |
40 |
25 x 25 |
forged copper |
20 down E |
5 E |
15 E |
electric blower |
< 1000 E |
rock ore |
55 - 60 |
45.5 |
60 |
9 |
5 |
bottom |
NR |
workable iron |
|
none specifically |
1.9 kg reproduction VA anvil from portion. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
21 / D10 |
DARC |
4-Nov-06 |
half banked short shaft |
clay cobb |
60 + 30 |
75 |
23 |
ceramic tube |
22.5 down |
5 |
10 |
vacumn blower |
1060 |
rock ore |
55 - 60 |
23.5 |
33 |
6 |
2:40 |
top |
none |
iron rich slag only |
|
none specifically |
3rd reuse of furnace - why this result? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
22 |
|
6-Nov-06 |
half banked short shaft |
reuse of above |
60 + 30 |
75 |
23 |
ceramic tube |
22.5 down |
5 |
10 |
vacumn blower |
1060 |
rock ore / gauge |
55-60 |
8.8 / 10 |
49 |
7 |
3:20 |
top |
6.8 |
workable iron |
36.2% |
Reserection' for # 21 |
self proof of ability |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
23 |
Mikaff & Paddon |
2-Jun-07 |
Econo Norse |
brick inside sheet |
60 |
40 |
25 |
ceramic tube |
22.5 down |
5 |
15 E |
vacumn blower |
800 |
hematite |
69 |
22.3 |
63.5 |
8 |
4 |
dissassemble |
12.7 |
workable mid carbon |
57.0% |
course |
excellent student results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24 / D11 |
DARC |
9-Jun-07 |
half banked short shaft |
clay cobb |
60 + 30 |
75 |
23 |
ceramic tube |
15 down |
5 |
14 |
vacumn blower |
900 |
rock ore |
? |
20 |
56 |
9 |
5 |
top |
0.9 |
workable iron |
4.5% |
hot swap' doouble smelt |
4th use / expected low return from poor ore |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
25 / D12 |
DARC |
1-Jun-07 |
half banked short shaft |
clay cobb |
60 + 30 |
75 |
23 |
ceramic tube |
15 down |
? |
? |
vascumn blower |
900 |
rock ore / hematite |
? |
23.9 |
42 |
9 |
3:15 |
top |
3.1 |
workable iron |
13.0% |
hot swap' double smelt |
5th use / expected improvement mixed ore |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
26 |
Neil Peterson |
7-Oct-07 |
half banked short shaft |
clay, stone slab front |
65 * |
55 |
23 x 27 |
ceramic tube |
22.5 down |
flush |
10 ? |
vacumn blower |
800 * |
taconite |
65 |
12.3 |
54 |
8 |
4 |
top |
6 |
workable iron |
48.8% |
use of stone slab above tuyere |
intial use of low air, increased half way |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
27 / D13 |
DARC |
27-Oct-07 |
half banked short shaft |
stone with clay seal |
70 |
45 |
35 x 25 |
ceramic tube |
26 down |
flush |
18 |
vacumn blower |
430 |
hematite |
69 |
12 |
34 |
21 |
4:50 |
bottom |
1 |
poorly sintered |
8.3% |
all stone slab - low air |
1.8 kg unsintered + 2.3 kg gromps = 4.1 kg |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
28 |
Martin Group |
25-Nov-07 |
short shaft |
clay cobb |
72 |
50 |
25 |
ceramic tube |
22.5 down |
5 |
10 |
vacumn blower |
770 |
taconite |
65.0 |
18.2 |
60 |
|
4 |
top |
5.5 |
workable iron |
30.2% |
course |
excellent student results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
29 |
Williams & Keen |
13-Mar-08 |
medium shaft |
clay cobb |
105 |
60 |
30 tapered |
plate & hole |
|
6 set back |
? |
electric blower |
|
rock ore |
55 - 60 |
23 |
45 |
12 |
4:30 |
bottom |
5.5 |
soft, crescent |
23.9% |
test of plate & blow hole |
better yield than expected |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
30 |
Williams & Keen |
16-Mar-08 |
medium shaft |
repeat above |
105 |
60 |
30 tapered |
plate & hole |
|
6 set back |
? |
electric blower |
|
DD 1 |
54 |
30.2 |
60 |
13 |
5:30 |
bottom |
1.7 |
high carbon |
5.6% |
test of plate & blow hole |
expected lower yield from method |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
31 |
Williams & Keen |
17-Mar-08 |
medium shaft |
repeat above |
105 |
58 |
30 tapered |
plate & hole |
22 do2wn |
13.5 set back |
? |
electric blower |
|
rock ore |
55 - 60 |
59.5 |
68 |
12 |
6:00 |
bottom |
7.7 |
soft iron column |
12.9% |
test of plate & blow hole |
moving hole position |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
32 / D14 |
DARC |
13-Apr-08 |
Econo Norse |
brick inside can |
70 |
45 |
20 |
ceramic tube |
20 down |
5 |
15 |
electric blower |
450 - 365 |
DD1 |
54 |
18 |
34 |
14 - 17 |
5:30 |
bottom |
2 |
workable iron |
11.1% |
test of furnace |
good function of smaller transportable unit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
33 |
Arne Espelund |
30-Apr-08 |
modified medium shaft |
clay cobb |
55 (of 110) |
30 |
25 |
steel pipe |
20 down |
flush |
? |
danish vacumn |
1000 |
Goulage bog |
56 |
15 |
13 |
11 for 2 kg |
2:30 |
bottom |
none |
iron rich slag |
|
Espelund theoretical |
slag produciton only |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
34 |
Arne Espelund |
2-May-08 |
modified medium shaft |
clay cobb |
70 (of 110) |
50 |
25 |
steel pipe |
20 down |
flush |
10 |
danish vacumn |
1000 |
iron rich slag |
38 |
7.75 |
12 |
11 for 2 kg |
2:30 |
bottom |
none |
|
|
Espelund theoretical |
poor results - question method? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
35 |
|
4-May-08 |
medium shaft |
clay cobb |
110 |
85 |
25 |
steel pipe |
23 down |
flush |
10 |
danish vacumn |
1000 |
Danish / Swedish mix |
|
15.2 |
20 |
9 for 2 kg |
3:50 |
bottom |
1.8 |
lacy in slag block |
11.8% |
demonstration of developed methods |
less than good result, ore quality? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
36 / D15 |
DARC |
14-Jun-08 |
half banked short shaft |
clay cobb |
65 |
47 |
23 - 26 |
ceramic tube |
23.5 down |
3.5 |
11 E |
electric blower |
660 - 780 |
DD1 |
54 |
20 |
30 |
10 |
3:20 |
bottom |
1.9 |
partially consolidated |
9.5% |
ore test in proven furnace |
3 x consolidation cycles |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
37 |
Ken Cook |
27-Sep-08 |
short shaft |
clay cobb on plinth |
65 + 20 |
45 |
25 |
ceramic tube |
22.5 down |
5 |
20 |
electric blower |
800 |
rock ore |
|
34.5 |
64 |
10 |
4:20 |
top |
9.5 |
workable iron |
27.5% |
Quad State demo |
excellent demonstration results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
38 / D16 |
DARC |
12-Oct-08 |
banked short shaft |
clay cobb |
65 |
37 |
22 |
plate & hole / ceramic tube |
tube 10 D |
? |
20 |
electric blower |
740 - 625 |
poor rock & taconite |
|
23 |
46 |
13 |
4:50 |
bottom |
4.9 |
colder on extraction |
21.3% |
working systems test / plate and blow hole |
problems with slag too high, shift to insert |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
39 / D17 |
DARC |
8-Nov-08 |
banked short shaft |
clay cobb |
65 + 20 |
42 |
26 - 24 |
plate & hole |
25 down |
2.5 set back |
20 |
electric blower |
400 - 1000 |
poor rock & hematite |
|
23 |
48 |
12 |
4:50 |
top |
3.25 |
lumpy texture |
14.1% |
working systems test |
expected lower yield from method |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
40 / D18 |
DARC |
30-May-09 |
short shaft |
clay |
62 |
45 |
20 |
ceramic tube |
23 down |
3 |
17 |
electric blower |
640 |
DD2 |
64 |
18 |
31 |
16 |
4:30 |
top |
4.9 |
very dense |
27.2% |
furnace design |
viability of working space |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
41 / D19 |
DARC |
11-Oct-09 |
short shaft |
clay block & fire brick |
62 |
48 |
20 |
ceramic tube |
22 down |
3 |
14 |
electric blower |
900 E |
DD + hematite mix |
61 |
20.7 |
43 |
12 |
4:45 |
top |
5.6 |
very dense |
27.1% |
placement of slack tub / Frankenbellows |
interpret as stubb / failed mechanical design |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
42 / D20 |
DARC |
7-Nov-09 |
short shaft |
clay / sand |
55 |
40 |
22 |
ceramic tube |
22.5 down |
5 |
15 |
smelt bellows |
700 E |
DD2 |
64 |
18 |
31 |
16 |
3:30 |
top - broken |
2.9 |
dense |
16.1% |
human powered air |
expected lower yield / different placement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
43 / D21 |
DARC |
12-Jun-10 |
short shaft |
clay / sand |
68 |
48 |
23 to 28 |
steel pipe |
22.5 down |
5 |
19 |
smelt bellows |
700 E |
DD1 & hematite mix |
55 |
20 |
? |
unknown |
? |
top |
1.6 |
lumpy |
8.0% |
all historic method |
expected lower yield / working layout |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
44 / D22 |
DARC |
21-Aug-10 |
short shaft |
clay / sand |
63 |
45 |
22 to 24 |
steel pipe |
19 down |
4.5 |
18 |
smelt bellows |
700 E |
DD2 |
64 |
20 |
35.5 |
14 |
4:30 |
top - broken |
2.8 |
lumpy fragments |
14.0% |
demonstration on site |
proof of historic method |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
45 / D23 |
DARC |
6-Nov-10 |
Econo- Norse |
fire brick |
76 |
55 |
28 |
ceramic tube |
23 down |
4 |
21 |
electric blower |
? |
hematite |
67 |
24 |
42 |
9 |
3:00 |
dismantle |
8.5 |
higher carbon |
35.4% |
team experience |
needs more practice |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
46 |
Smeltfest |
18-Mar-11 |
flask with shaft |
clay cobb |
110 + |
85 |
65 |
clay mulitple |
slight down |
10 |
at floor |
passive |
?? |
rock ore |
66.5 |
91 |
195 |
14 |
10:00 |
bottom |
none |
|
|
proof of concept only |
too much focus on fine detail / modify method |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
47 |
Brown Students |
21-Apr-11 |
short shaft on plinth |
clay cobb |
64 |
48 |
24 to 25 |
ceramic / pipe |
22.5 down |
4.5 |
16 |
electric blower |
850 |
rock / DD1 / hematite |
? |
29 |
45 |
12 |
5:45 |
bottom |
2.2 |
|
20% E |
teaching |
proves viablity of progam |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D24 |
DARC |
11-Jun-11 |
Econo-Norse |
fire brick |
65 |
45 |
25 |
ceramic tube |
22.5 down |
5 |
20 |
electric blower |
900 |
rock ore |
|
24 |
48 |
11 |
4:20 |
dismantle |
2.65 |
spongey |
11.0% |
team experience |
too much detail on construction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D25 |
DARC |
28-Jul-11 |
Econo-Norse |
fire brick |
65 |
45 |
25 |
ceramic tube |
22.5 down |
5 |
20 |
electric blower |
900 |
DD1 |
54 |
26 |
47 |
12 |
5:00 |
dismantle |
5 |
workable iron |
19.2% |
public demonstration |
good team performance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
48 / D26 |
Burnham, Peterson |
9-Oct-11 |
short shaft / slag pit |
clay cobb |
55 |
43 |
25 |
ceramic tube |
22.5 down |
5 |
13 |
electric blower |
800 |
rock ore |
|
48 |
65 |
10 |
5:45 |
attempt bottom |
none |
|
|
proof of concept |
questionable ore means no iron |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
49 |
Peterson |
5-Nov-11 |
short shaft / slag pit |
reuse above |
55 |
43 |
25 |
ceramic tube |
22.5 down |
5 |
10 |
electric blower |
900 |
taconite |
65.4 |
19.2 |
48.5 |
11 |
4:00 |
top |
6.4 |
workable iron |
33.3% |
proof of concept |
repeat with good ore proves system |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50 |
|
5-May-12 |
short shaft |
clay / sand |
77 |
40 |
25 to30 |
forged copper |
22.5 down |
5 |
15 |
electric blower |
800 |
rock ore |
|
42.9 |
55 |
16 |
6:20 |
top - botom |
12.27 |
a bit lumpy |
28.6% |
production furnace build |
solid durable design as expected |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
51 / D28 |
DARC |
26-May-12 |
banked short shaft |
clay |
60 |
48 |
28 - 26 |
ceramic tube |
22 down |
5 |
10 |
electric blower |
800 |
DD1 |
48 |
31.8 |
49 |
12 |
5:30 |
top |
5.8 |
after 2 x compression |
18.2% |
resume Icelandic series |
re-familurization |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
52 |
Celtic College |
11-Aug-12 |
short shaft on plinth |
clay cobb |
64 |
45 |
32-25 |
ceramic tube |
22.5 down |
5.5 |
15 |
electric blower |
800 |
DD 1 + scale |
|
31.8 |
50 |
11 |
4:00 |
top |
7.1 |
dense |
22.3% |
public demonstration |
excellent demonstration & teaching |