Minden 'Bog Ore' | Constructing Smelter | During main smelt Sequence | Starting Burn Down | Extraction phase |
TIME | EVENT | ORE | CHARCOAL | AIR | |||||
ABSOLUTE | RELATIVE | ELAPSED | ADD (scoops) | AMOUNT | TOTAL | TOTAL | SETTING | VOLUME | |
(140 gm each) | (as lb) | (as lb) | (5 lb each) | (litre/min) | |||||
12:10 | 0:00 | start preheat | air at A + | 458 | |||||
12:45 | :35 | fill with ungraded charcoal | air at B | 703 | |||||
12:53 | :43 | 0 | start graded fuel | 5 | |||||
13:02 | :52 | 9 | 10 | air at A 3/4 | 597 | ||||
13:13 | 1:03 | 9 | 15 | air at A + | 458 | ||||
13:27 | 1:17 | 14 | 20 | ||||||
13:43 | 1:33 | 16 | 3 | 0.93 | 1.00 | 25 | |||
14:01 | 1:51 | 18 | 3 | 0.93 | 2.00 | 30 | |||
14:21 | 2:11 | 20 | 3 | 0.93 | 3.00 | 35 | |||
14:30 | air to A 3/4 | 597 | |||||||
14:37 | 2:27 | 16 | 3 | 0.93 | 4.00 | 40 | |||
14:57 | 2:47 | 20 | 4.5 | 1.40 | 5.30 | 45 | air to B | 703 | |
15:07 | 2:57 | 10 | 6 | 1.87 | 7.17 | 50 | air to B - 1/4 | 785 | |
15:19 | 3:09 | 12 | 6 | 1.87 | 9.03 | 55 | |||
15:33 | 3:23 | 14 | 6 | 1.87 | 10.90 | 60 | |||
15:45 | 3:35 | 12 | 9 | 2.80 | 13.70 | 65 | |||
16:00 | 3:50 | 15 | 9 | 2.80 | 16.50 | 70 | |||
16:23 | 4:13 | 23 | 6 | 1.87 | 18.37 | 75 | |||
16:35 | air to B + | 842 | |||||||
16:42 | 4:32 | 19 | obstuction cleared | 80 | |||||
burn down begins | 90 | ||||||||
TOTALS | LBS | 18.37 | 90 | ||||||
KG | 8.35 | 40.91 | |||||||
BLOOM PRODUCED | LBS | 1.5 | |||||||
KG | 0.68 | ||||||||
% | 12.25 |